Pegasystems PEGAPCRSA80V1_2019 Exam Practice Questions (P. 5)
- Full Access (60 questions)
- Six months of Premium Access
- Access to one million comments
- Seamless ChatGPT Integration
- Ability to download PDF files
- Anki Flashcard files for revision
- No Captcha & No AdSense
- Advanced Exam Configuration
Question #21
DRAG DROP -
Pega Robot Studio has several methods to manage the flow of an automation depending on when a control is matched.
In the Answer Area, drag the description on the left to its matching Design Block.
Select and Place:

Pega Robot Studio has several methods to manage the flow of an automation depending on when a control is matched.
In the Answer Area, drag the description on the left to its matching Design Block.
Select and Place:

send
light_mode
delete
Question #22
You are working on a team project with several other architects. Each architect is assigned to create activities for several applications. You are ready to add your
HR adapter project to the controller project.
Which three steps are required to add the HR project to the main solution? (Choose three.)
HR adapter project to the controller project.
Which three steps are required to add the HR project to the main solution? (Choose three.)
- ACreate an activity to make a call to the HR project to log in to the application.
- BImport the HR project to the controller project using the manage imported projects window.
- CUpdate the controlling project's .Net framework property to match the HR adapter project.
- DAdd an existing project from the solution file using the solution explorer window.
- EAdd an assembly reference to the HR project from the controller project.
Correct Answer:
ABE
ABE
send
light_mode
delete
Question #23
A service request manager, who responds to 1000 active service tickets per week, receives a ticket for new account creation. This ticket has been marked as the highest priority and contains all the necessary details for an account creation.
The manager creates an activity and assigns all the context values with appropriate values.
Which two activity methods of the account creation ticket can be used to close the ticket within priority? (Choose two.)
The manager creates an activity and assigns all the context values with appropriate values.
Which two activity methods of the account creation ticket can be used to close the ticket within priority? (Choose two.)
send
light_mode
delete
Question #24
The following Context variables are defined in the Interaction.xml of the solution.

An automation creates an interaction and later sets the following values for Procedures and HasBeenPaid.

When the agent finishes the call, an automation clears the context variables using ClearContext.

What is the state of the HasBeenPaid variable at this point?

An automation creates an interaction and later sets the following values for Procedures and HasBeenPaid.

When the agent finishes the call, an automation clears the context variables using ClearContext.

What is the state of the HasBeenPaid variable at this point?
- AThe value of HasBeenPaid is now True.
- BThe value of HasBeenPaid is now False.
- CThe value of HasBeenPaid is now null.
Correct Answer:
B
B
send
light_mode
delete
Question #25
You are using the Interaction framework for your project solution.
Where in the solution do you add an Interaction Manager component?
Where in the solution do you add an Interaction Manager component?
- AIn the project configuration file.
- BAs a local component of the automation.
- CIn the global container of the project.
- DAs a global component of the automation.
Correct Answer:
A
Reference:
https://www.scribd.com/document/342685414/1-Introduction
A
Reference:
https://www.scribd.com/document/342685414/1-Introduction
send
light_mode
delete
All Pages