Oracle 1z0-348 Exam Practice Questions (P. 4)
- Full Access (65 questions)
- Six months of Premium Access
- Access to one million comments
- Seamless ChatGPT Integration
- Ability to download PDF files
- Anki Flashcard files for revision
- No Captcha & No AdSense
- Advanced Exam Configuration
Question #16
A Production operator in your company is required to report production activities, such as completing or scrapping production units, by referencing a work definition without creating work orders.
Identify the manufacturing transaction that a production operator can perform for reporting such activities.
Identify the manufacturing transaction that a production operator can perform for reporting such activities.
- AOrderless Transactions
- BOperation Transactions
- CResource Transactions
- DMovement request
- EMaterial Transactions
Correct Answer:
A
Reference:
https://docs.oracle.com/cloud/farel11/scmcs_gs/FAUMF/FAUMF2013521.htm#FAUMF2013702
A
Reference:
https://docs.oracle.com/cloud/farel11/scmcs_gs/FAUMF/FAUMF2013521.htm#FAUMF2013702
send
light_mode
delete
Question #17
Identify two conditions that should be met at the same time for a Standard Operation to be called an Optional Operation.
- AThere are no components attached to it.
- BThe Automatically Transact check box is deselected.
- CThe Automatically Transact check box is selected.
- DThe Count Point check is selected.
- EThe Count Point check box is deselected.
Correct Answer:
BE
Reference:
https://docs.oracle.com/cloud/latest/scmcs_gs/FAUMF/FAUMF2092335.htm#FAUMF2092335
(see note)
BE
Reference:
https://docs.oracle.com/cloud/latest/scmcs_gs/FAUMF/FAUMF2092335.htm#FAUMF2092335
(see note)
send
light_mode
delete
Question #18
The Manufacturing plant has two 8-hour shifts for the work center WC1: Day Shift and Night Shift. You associate four units each for resources R1, R2, R3, and R4 to the work center WC1. The customer wants to assign all units of resource R2 available for Day and Night Shift.
Identify the correct sequence of steps to achieve this requirement.
Identify the correct sequence of steps to achieve this requirement.
- AAssociate Resource R2 with Work Center WC1> Select Available 24 Hours check box> Resource Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column.
- BAssociate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource Availability region> Enter 2 in Day Shift Column> Enter 2 in Night Shift Column
- CAssociate Resource R2 with Work Center WC1> Select the Available 24 Hours check box> Resource Availability region> Enter 2 in Day Shift Column > Enter 2 in Night Shift Column.
- DAssociate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource Availability region> Enter 4 in Day Shift Column>
Correct Answer:
C
C
send
light_mode
delete
Question #19
An order entry specialist creates a Back-to-Back order for product item with an intention of fulfilling by in-house manufacturing. The fulfillment line is scheduled and Supply Chain Orchestration (SCO) has initiated creation of a Supply Order rather than Work Order.
Identify two options that can cause this situation.
Identify two options that can cause this situation.
- ASourcing rules for the product item are defined as Make as well as Transfer.
- BSourcing rule for the product item is defined as Make, but Work Definition is not defined.
- CSourcing rules for the product item are defined as Buy as well as Transfer.
- DSourcing rule for the product item is defined as Buy.
Correct Answer:
AB
AB
send
light_mode
delete
Question #20
Identify two reports that provide work order cost-related information to the costing user.
- AWork order Operational Analysis
- BWIP Balance by Plant
- CPurchase Variance Summary
- DCost Accounting Dashboard
Correct Answer:
AD
AD
send
light_mode
delete
All Pages