Oracle 1z0-348 Exam Practice Questions (P. 3)
- Full Access (65 questions)
- Six months of Premium Access
- Access to one million comments
- Seamless ChatGPT Integration
- Ability to download PDF files
- Anki Flashcard files for revision
- No Captcha & No AdSense
- Advanced Exam Configuration
Question #11
You can generate and manage work order exceptions in Oracle Manufacturing Cloud. Which users can report production exception and who gets notified after an exception is raised?
- AThe Production Operator can report and exception and the application generates a notification that is sent to all users who have access to the manufacturing plant.
- BThe Production Operator can report an exception and the application generates a notification that is sent to all users with the role of production supervisor who have access to the manufacturing plant.
- CThe Production Operator or Manufacturing Engineer can report an exception and notifies the production supervisor using Oracle Social Network since there is no system generated notification.
- DThe Production Operator can report an exception and notifies the production supervisor using Oracle Social Network since there is no system-generated
Correct Answer:
B
Reference:
https://docs.oracle.com/cloud/latest/scmcs_gs/FAUMF/FAUMF2092338.htm#FAUMF2273578
B
Reference:
https://docs.oracle.com/cloud/latest/scmcs_gs/FAUMF/FAUMF2092338.htm#FAUMF2273578
send
light_mode
delete
Question #12
During a Manufacturing Cloud implementation, the customer request to develop Oracle Transactional Business Intelligence reports that are not available out-of- the box.
Identify the tool that is available to the Report Developer in Manufacturing Cloud to develop the reports.
Identify the tool that is available to the Report Developer in Manufacturing Cloud to develop the reports.
- AOracle Business Intelligence Standard Edition
- BOracle Business Intelligence Publisher
- COracle Business Intelligence Enterprise Edition
- DOracle Business Intelligence Application
Correct Answer:
B
B
send
light_mode
delete
Question #13
A manufacturing plant works for two shifts of 8 hours each. The Manufacturing user wants a work center resource R1 of 4 units to be available during a nonworking time outside the regular shift on a particular day.
Identify the sequence of steps to create a resource exception in the Manage Work Center Resource Calendar page.
Identify the sequence of steps to create a resource exception in the Manage Work Center Resource Calendar page.
- AClick Outside the existing Shift time on a Specific Date> Create Work Center page> Click the Resource Availability tab> Click Add icon> Select R1 from Resource Drop-down list> Enter 4 in Default Units Availability column.
- BClick Inside the existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability region> Populate 4 units in Default Availability column.
- CClick Inside the existing Shift time on a Specific Date>Create Work Center page>Click the Resource Availability tab>Click Add icon> Select R1 from Resource Drop-down list> Enter4 in Default Units Available.
- DClick Outside the existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource
Correct Answer:
D
Reference:
https://docs.oracle.com/cloud/latest/scmcs_gs/FAUMF/FAUMF2092337.htm#FAUMF2014030
D
Reference:
https://docs.oracle.com/cloud/latest/scmcs_gs/FAUMF/FAUMF2092337.htm#FAUMF2014030
send
light_mode
delete
Question #14
A plant runs 24x7 daily using three continuous shifts of 8 hours each. One unit of an equipment resource R1 is assigned to each of the three shifts. On a specific work order, the resource R1 is required to work for 2 hours. The resource is set up with an efficiency of 50% and utilization of 100%. R1 is scheduled to start on the given work order at noon.
What time will R1 be scheduled to finish, assuming no calendar exceptions have been set?
What time will R1 be scheduled to finish, assuming no calendar exceptions have been set?
send
light_mode
delete
Question #15
In a manufacturing plant, two purchase components P1 and P2 and a resource R1 are required to assemble a product. The cost of the assembly is calculated by using the standard costing method. The work definition and resource rates of the assembly have been defined as required.
A cost accountant is estimating cost of the assembly, analyzing rolled-up costs before finally publishing estimates as frozen standards to cost accounting by using a cost planning scenario. While reviewing rolled up costs, the extended costs of purchase components are not included in a rolled-up scenario.
Identify the reason.
A cost accountant is estimating cost of the assembly, analyzing rolled-up costs before finally publishing estimates as frozen standards to cost accounting by using a cost planning scenario. While reviewing rolled up costs, the extended costs of purchase components are not included in a rolled-up scenario.
Identify the reason.
- APurchase components P1 and P2 are not associated with Material cost plan of the cost planning scenario.
- BCosts for purchase components P1 and P2 are not defined in cost accounting.
- CCreate Accounting was not initiated.
- DCreate Accounting Distributions was not initiated.
Correct Answer:
D
D
send
light_mode
delete
All Pages