HP HPE0-S58 Exam Practice Questions (P. 4)
- Full Access (97 questions)
- Six months of Premium Access
- Access to one million comments
- Seamless ChatGPT Integration
- Ability to download PDF files
- Anki Flashcard files for revision
- No Captcha & No AdSense
- Advanced Exam Configuration
Question #16
A customer needs to deploy a farm of Windows Server 2019 Hyper-V using an Image Streamer. The customer discovered that the OS Build Plan for this OS is not available from the Image Streamer interface.
How can the customer access all the tools and scripts needed to provision the required operating system?
How can the customer access all the tools and scripts needed to provision the required operating system?
- AThe customer has to update Image Streamer firmware, as with the new firmware all OS Build Plans are updated and new ones are added.
- BThe customer must buy an Image Streamer upgrade license to get support for the latest operating systems.
- CThe customer needs to download the artifact bundle from the internet that will provide all required components.
- DThe customer can use any Windows build plan because they are self-updating.
Correct Answer:
C
Reference:
https://h20195.www2.hpe.com/v2/GetPDF.aspx/c04815217.pdf
C
Reference:
https://h20195.www2.hpe.com/v2/GetPDF.aspx/c04815217.pdf
send
light_mode
delete
Question #17
HOTSPOT -
An integrator has installed a new Synergy frame into a rack with two existing Synergy frames in a customer's environment.
Click where the integrator should verify that the cabling for the management ring was completed correctly.
Hot Area:

An integrator has installed a new Synergy frame into a rack with two existing Synergy frames in a customer's environment.
Click where the integrator should verify that the cabling for the management ring was completed correctly.
Hot Area:

Correct Answer:
Reference:
https://support.hpe.com/hpsc/doc/public/display?docId=a00048164en_us

Reference:
https://support.hpe.com/hpsc/doc/public/display?docId=a00048164en_us
send
light_mode
delete
Question #18
A customer needs to aggregate uplink ports from two Virtual Connect interconnects to increase bandwidth and availability of the networks configured for HPE
Synergy platform.
Which steps must the integrator perform in the configuration to meet the customer's needs?
Synergy platform.
Which steps must the integrator perform in the configuration to meet the customer's needs?
- AConnect Satellite modules using Ports L1 and L4
- BConnect Ports Q7 and Q8 on the Master interconnect Modules (ICM)
- CInstall Redundant Frame Link Modules and a second management ring
- DEnable Intelligent Resilient Fabric (IRF) on the Virtual Connect Modules
Correct Answer:
A
A
send
light_mode
delete
Question #19
Which operating systems are supported for use with Image Streamer? (Choose two.)
- AVMware ESXi 6.7
- BCentOS 7.2
- CSUSE Linux Enterprise Server 11
- DWindows Hyper-V 2019
- ERed Hat Enterprise Linux 7.3
Correct Answer:
DE
Reference:
https://support.hpe.com/hpsc/doc/public/display?docId=emr_na-a00061945en_us&docLocale=en_US
DE
Reference:
https://support.hpe.com/hpsc/doc/public/display?docId=emr_na-a00061945en_us&docLocale=en_US
send
light_mode
delete
Question #20
An HPE Synergy compute module has a template-based server profile with two identically configured connections, each containing five VLANs.
What is the most efficient method the integrator can use to add a new VLAN to each connection?
What is the most efficient method the integrator can use to add a new VLAN to each connection?
- AAdd the new VLAN to the network set configured in the profile template, and update the server profile from the template
- BAdd the new VLAN under Edit server profile connections
- CAdd the new VLAN to the network set configured in the profile template
- DAdd the new VLAN under Edit server profile connections in the profile template, and update the server profile from the template
Correct Answer:
A
A
send
light_mode
delete
All Pages