Question #1
                                    A cloud architect is writing an implementation plan for deployment of a clustered vRealize Automation deployment that will use a third-party load balancer.
Which two steps should the architect include within the implementation plan to ensure a successful deployment of vRealize Automation? (Choose two.)
                                
                              Which two steps should the architect include within the implementation plan to ensure a successful deployment of vRealize Automation? (Choose two.)
- ADisable all secondary nodes from the load balancer poolsMost Voted
 - BCreate and configure the monitoring of vRealize Automation and vRealize Orchestrator
 - CEnsure all the SAN certificates for vRealize Suite are available
 - DEnable all non-primary nodes on the load balancer
 - ETurn off the health monitors or change them temporarily to default to ICMP and ensure traffic is still forwarding to the primary nodeMost Voted
 
                                        Correct Answer:
BC
Reference:
https://docs.vmware.com/en/VMware-Validated-Design/6.1/sddc-deployment-of-cloud-operations-and-automation-in-the-first-region/GUID-18A6AEF4-2EF7-47B2-
B421-D34156344652.html
                                   
                                    BC
Reference:
https://docs.vmware.com/en/VMware-Validated-Design/6.1/sddc-deployment-of-cloud-operations-and-automation-in-the-first-region/GUID-18A6AEF4-2EF7-47B2-
B421-D34156344652.html
          
          send
        
        
          light_mode
          delete
      
    Question #2
                                    Which two statements are correct for VMware Cloud Services cloud proxy? (Choose two.)
                                
                              - AIt helps connect to public cloud entities.
 - BIt connects cloud services to on-premises networks.
 - CAn OVA deployment to an ESXi server is supported.
 - DIt requires a load balancer.
 - EAn OVA must be deployed on a vCenter Server.
 
                                        Correct Answer:
BE
Reference:
https://docs.vmware.com/en/VMware-Cloud-services/1.0/Cloud_proxy_VMware_Cloud_services.pdf
                                        
                                    
                                   
                                    BE
Reference:
https://docs.vmware.com/en/VMware-Cloud-services/1.0/Cloud_proxy_VMware_Cloud_services.pdf
                                        
                                    
          
          send
        
        
          light_mode
          delete
      
    Question #3
                                    A customer requests a conceptual design for the Cloud Management solution.
What three selections represent a conceptual design? (Choose three.)
                                
                              What three selections represent a conceptual design? (Choose three.)
- ACloud Automation
 - BIdentity Management
 - CvRealize AutomationMost Voted
 - DWorkspace One AccessMost Voted
 - EMonitoring and Logging
 - FvRealize Log InsightMost Voted
 
                                        Correct Answer:
ABE
                                        
                                        
                                            
                                        
                                    
                                   
                                    ABE
          
          send
        
        
          light_mode
          delete
      
    Question #4
                                    What are the two valid characteristics of vRealize Automation Cloud? (Choose two.)
                                
                              - ASupports on-premises vSphere and vRealize Orchestrator
 - BRequires a standard license
 - CRequires a load balancer
 - DSupports on-premises vRealize Operations Manager
 - EHas a frequent release cycle
 
                                        Correct Answer:
CD
Reference:
https://docs.vmware.com/en/vRealize-Automation/8.2/using-and-managing-vrealize-automation-cloud-assembly.pdf
                                   
                                    CD
Reference:
https://docs.vmware.com/en/vRealize-Automation/8.2/using-and-managing-vrealize-automation-cloud-assembly.pdf
          
          send
        
        
          light_mode
          delete
      
    Question #5
                                    An architect is designing a greenfield VMware vRealize Cloud Management solution. During the requirements gathering workshop with the customer, the future Service Owner made the following comment:
The Maximum Tolerable Downtime (MTD) for the Cloud Management solution is 1 hour.
When creating the design documentation, which design quality should be used to classify the requirements?
                                
                              The Maximum Tolerable Downtime (MTD) for the Cloud Management solution is 1 hour.
When creating the design documentation, which design quality should be used to classify the requirements?
- AManageability
 - BAvailability
 - CRecoverabilityMost Voted
 - DPerformance
 
                                        Correct Answer:
C
Reference:
https://elatov.github.io/2012/08/vcap5-dcd-objective-2-3-build-availability-requirements-into-the-logical-design/
                                        
                                    
                                   
                                    C
Reference:
https://elatov.github.io/2012/08/vcap5-dcd-objective-2-3-build-availability-requirements-into-the-logical-design/
                                        
                                    
          
          send
        
        
          light_mode
          delete
      