Question #21
Which of the following is NOT true regarding Regional Priority credits?
- ARegional Priority credits are listed by zip code on the USGBC website
- BRegional Priority credits are not new credits, there are only bonus points for existing credits
- CRegional Priority credits are also known as exemplary performance credits
- D6 Regional Priority credits are listed for each zip code
- EA project can earn a maximum of 4 Regional Priority credits
Correct Answer:
C
Exemplary performance credits are unrelated to Regional Priority credits. Exemplary performance credits are awarded under the Innovation in Design category.
C
Exemplary performance credits are unrelated to Regional Priority credits. Exemplary performance credits are awarded under the Innovation in Design category.
send
light_mode
delete
Question #22
Which of the following are examples of preconsumer materials? (Choose 2)
- AFlyash from a factory used in new concrete
- BUsed plastic water bottles
- CExtra newspaper from a printing press
- DOld computers from an office
- EUsed grocery bags
Correct Answer:
AC
AC
send
light_mode
delete
Question #23
Which of the following are considered to be natural refrigerants? (Choose 3)
send
light_mode
delete
Question #24
A project team comes across a unique situation while performing calculations for a specific credit. They believe their project meets the intent of the credit and would like to submit a Credit Interpretation Ruling (CIR). Which of the following are important facts to remember about submitting a CIR? (Choose 3)
- ALimit CIR submission text to 600 words
- BRequest guidance on only one credit/prerequisite per CIR
- CA CIR may only be submitted AFTER the design review
- DThe option to submit a CIR expires upon the final award or denial of certification
- EProvide a lengthy project background
Correct Answer:
ABD
ABD
send
light_mode
delete
Question #25
Which material below is not considered a rapidly renewable resource?
send
light_mode
delete
Question #26
Green Seal Standard GC-03 applies to which of the following?
- AClear wood finishes, floor coatings, stains, and shellacs
- BAdhesives, sealants and sealant primers
- CCarpet adhesives
- DAnti-corrosive and anti-rust paints
- EArchitectural paints, coatings, and primers
Correct Answer:
D
D
send
light_mode
delete
send
light_mode
delete
Question #28
Which of the following are examples of post-consumer materials? (Choose 2)
- AEmpty soda cans
- BScrap steel at a mill that is re-melted into usable material
- COld magazines
- DExtra newspaper from a printing press
- EExtra rubber from a tire manufacturing plant used in a walking path
Correct Answer:
AC
AC
send
light_mode
delete
Question #29
What is true regarding the use of native plants? (Choose 2)
- AGenerally require less irrigation
- BWould NOT contribute towards any green strategies
- CNoninvasive
- DHigh maintenance
Correct Answer:
AC
AC
send
light_mode
delete
Question #30
What is the cost to submit a Credit Interpretation Request (CIR)?
- A$100 each
- B$220 each
- C$300 each
- D$220 for unlimited CIRs
- E$300 for unlimited CIRs
Correct Answer:
B
B
send
light_mode
delete