Question #11
Your customer needs to move their on-premises applications to Oracle Cloud Infrastructure (OCI). One of their applications is running on an NGINX server and a 2-node Oracle Real Application Clusters (RAC) database.
What is the most cost-effective mechanism to migrate the customer application to OCI and set up regular automated backups?
What is the most cost-effective mechanism to migrate the customer application to OCI and set up regular automated backups?
- ALaunch a compute instance and run an NGINX server to host the application. Deploy Autonomous Database and import the database using Oracle Data Pump.
- BLaunch a compute instance and run an NGINX server to host the application. Deploy a 2-node VM DB Systems with Oracle RAC enabled. Import the on-premises database to OCI VM DB Systems using Oracle Data Pump and then enable automatic backups.Most Voted
- CLaunch a compute instance for both the NGINX application server and the database server. Attach block volumes on the database server compute instance and enable backup policy to backup the block volumes.
- DLaunch a compute instance and run an NGINX server to host the application. Deploy a 1-node VM DB Systems with Oracle RAC enabled. Import the on-premises database to OCI VM DB Systems using data pump and then enable automatic backups.
Correct Answer:
B
B
send
light_mode
delete
Question #12
Your company needs to migrate a business critical application from your data center to Oracle Cloud Infrastructure (OCI). The application runs on Oracle Database and both the application and database servers run on Oracle Linux version 7. The application server is WebLogic server running on multiple 4-core servers and the database is deployed as an Oracle Database Enterprise Edition RAC database on 2 servers (4-cores each).
Which method of database migration should you choose so that the application has minimal impact?
Which method of database migration should you choose so that the application has minimal impact?
- ADeploy Exadata Cloud Service Base rack and use Oracle Data Pump tool to migrate the data from customer on-premises to OCI.
- BDeploy Autonomous Transaction Processing Database on OCI and use the MV2ADB tool for the database migration.
- CDeploy Virtual Machine RAC DB system on OCI and use the Oracle Database Backup module with RMAN to migrate the data from customer on-premises to OCI.
- DDeploy Virtual Machine RAC DB system on OCI and use the ZDM tool for the database migration.Most Voted
Correct Answer:
D
D
send
light_mode
delete
Question #13
A company has an urgent requirement to migrate 300 TB of data to Oracle Cloud Infrastructure (OCI) in two weeks. Their data center has been recently struck by a massive hurricane and the building has been badly damaged, although still operational. They have a 100 Mbps Internet line but the connection is intermittent due to the damages caused to the electrical grid.
In this scenario, what is the most effective configuration to use to migrate the data to OCI given the time constraints?
In this scenario, what is the most effective configuration to use to migrate the data to OCI given the time constraints?
- ASet up an OCI Storage Gateway to connect your data center and your VCN. Once the connection has been established, upload all data to OCI.
- BUpload the data to OCI using OCI Object Storage multipart upload tool.
- CSet up a OCI Storage Gateway to connect your data center and your VCN. Once the connection has been established, upload all data to OCI using CCI Storage Gateway Cloud Sync tool.
- DUse multiple OCI Data Transfer Appliances to transfer data to OCI.Most Voted
- ESet up a hybrid network by launching a 1Gbps FastConnect virtual circuit between your data center and OCI. Use OCI Object Storage multipart upload tool to automate the migration of your data to OCI.
Correct Answer:
D
D
send
light_mode
delete
Question #14
A large E-commerce company is looking to run seasonal workloads in Oracle Cloud Infrastructure. The Oracle database used by their E-commerce application can use up to 52 cores at peak workloads. Due to the seasonal nature of the business, the database will not be used for 10 months in a year and can also be shut down during non-business hours.
Which database service is the most economical for this scenario?
Which database service is the most economical for this scenario?
- AOracle Cloud Infrastructure Virtual Machine DB Systems
- BOracle Cloud Infrastructure Exadata DB Systems
- COracle Cloud Infrastructure Bare Metal DB Systems
- DAutonomous Transaction Processing with shared Exadata infrastructureMost Voted
Correct Answer:
D
D
send
light_mode
delete
Question #15
Which of the two options are true for an autonomous database in dedicated infrastructure deployment? (Choose two.)
- AYou can modify maintenance schedule of the AVM after provisioning, to match your organization maintenance schedules.Most Voted
- BThe new resource model consists of autonomous exadata infrastructure, autonomous container database and autonomous database.
- CUnlike autonomous database in shared infrastructure, you can customize the maintenance schedule of the autonomous databases in dedicated infrastructure in OCI public cloud.
- DThe new resource model consists of exadata infrastructure, autonomous Exadata VM cluster, autonomous container database.Most Voted
- ENetwork selection, License model and certificate management are resources configured at AVM level.
Correct Answer:
DE
DE