Oracle 1z0-1091-22 Exam Practice Questions (P. 3)
- Full Access (51 questions)
- Six months of Premium Access
- Access to one million comments
- Seamless ChatGPT Integration
- Ability to download PDF files
- Anki Flashcard files for revision
- No Captcha & No AdSense
- Advanced Exam Configuration
Question #11
In SaaS, which THREE configuration steps would you perform to convert natural gas volume to energy at the measuring component level? (Choose three.)
- ACreate value identifiers far the energy Unit of Measure (UOM) on the device.
- BSet up a factor to hold the conversion values.
- CConfigure a value derivation algorithm by using Groovy.
- DCreate value identifiers for the energy UOM on the measuring component type.
- EConfigure a value derivation algorithm by using Java.
Correct Answer:
ABD
ABD
send
light_mode
delete
Question #12
How do you configure the derived values that are relevant for a device?
- AConfigure the derived values on the final measurement type for the measuring components to be defined on the device.
- BConfigure the derived values on the device type for the derived values to be defined on the device.
- CConfigure the derived values on the measuring component type for the measuring components to be defined on the device.
- DConfigure the derived values on the measuring component for the measuring components to be defined on the device.
Correct Answer:
C
C
send
light_mode
delete
Question #13
At which stage during the high-level process of loading interval initial measurement data does Meter Data Management (MDM) normalize measurements and why?
- AValidation, Estimation, and Editing (VEE) stage, so that each interval can be compared to a specific date and time for validation.
- BCreate the Final Measurements stage, so that each interval measurement is stored as a single record for a specific date and time.
- CLoad the Initial Measurements stage, so that each interval measurement is stored as a single record for a specific date and time.
- DCreate the Final Measurements stage, so that each interval is stored as the adjusted value to represent an average interval value.
Correct Answer:
C
C
send
light_mode
delete
Question #14
Which relationship must be established with an external system or a service provider before creating bill determinants in Meter Data Management (MDM)?
send
light_mode
delete
Question #15
Which statement is true about usage transaction?
- AIt is created by an external source or Meter Data Management (MDM), which uses the usage calculation engine to generate usage values.
- BIt is created by an external source or MDM, which uses the usage calculation engine to generate a final value. Valuation, Estimation, and Editing (VEE) can be configured but when called in real time, usage transaction may not be saved.
- CIt must be created by an external system and it must be stored in the database.
- DIt is created by an external source or MDM, which uses the usage calculation engine to generate a final value. VEE can be configured and usage transaction is saved.
Correct Answer:
D
D
send
light_mode
delete
All Pages