Question #11
You are designing a lab exercise with an application that includes a large number of graphics with large file sizes. The application becomes unresponsive if the graphics are embedded in the application.
You have uploaded the graphics to Oracle Cloud Infrastructure Object Storage bucket and added the URL paths for the individual objects in the application. You need to ensure these graphics are accessible without requiring any authentication for an extended period of time.
How can you achieve these requirements?
You have uploaded the graphics to Oracle Cloud Infrastructure Object Storage bucket and added the URL paths for the individual objects in the application. You need to ensure these graphics are accessible without requiring any authentication for an extended period of time.
How can you achieve these requirements?
- AMake the Object Storage bucket public and use the URL path for the individual objects.Most Voted
- BCreate pre-authenticated requests (PAR) and do not specify any expiration time.
- CMake the Object Storage bucket private, make all objects public, and use the URL found in the object "Details".
- DCreate pre-authenticated requests (PAR) and specify 00:00:0000 as the expiration time.
Correct Answer:
C
C
send
light_mode
delete
Question #12
You are about to upload a large log file (5 TiB size) to Oracle Cloud Infrastructure Object Storage and have decided to use multipart upload capability for a more efficient and resilient upload.
Which two statements are true about multipart upload? (Choose two.)
Which two statements are true about multipart upload? (Choose two.)
- AWhile a multipart upload is still active, you cannot add parts even if the total number of parts is less than 10,000.
- BYou do not have to commit the upload after you have uploaded all the object parts.
- CThe maximum size for an uploaded object is 10 TiB.Most Voted
- DIndividual object parts must be no larger than 50 GiB.Most Voted
Correct Answer:
CD
CD
send
light_mode
delete
Question #13
What is a valid RFC 1918 CIDR prefix that can be used for creating an Oracle Cloud Infrastructure Virtual Cloud Network?
- A8.8.8.8/8
- B10.0.0.0/8
- C172.16.0.0/12
- D192.168.0.0/16Most Voted
- E189.215.154.89/32
- F0.0.0.0/0
Correct Answer:
D
D
send
light_mode
delete
Question #14
Which is NOT a valid Oracle Cloud Infrastructure Virtual Cloud Network (VCN) approach?
- APrivate subnets are recommended to have individual route tables to control the flow of traffic within and outside of VCN.
- BEnsure VCN CIDR prefix overlaps with other VCNs in your tenancy or with your organizations private IP network ranges
- CUse OCI tags to tag VCN resources so that all resources are following organizational tagging/naming conventions
- DEnsure not all IP addresses are allocated at once within a VCN or subnet, instead plan to reserve some IP addresses for future use.
Correct Answer:
B
B
send
light_mode
delete
Question #15
When creating an Oracle Cloud Infrastructure Virtual Cloud Network (VCN) with the VCN wizard, what THREE gateways get created automatically? (Choose three.)
- ABastion Host
- BInternet Gateway
- CDynamic Routing Gateway
- DLocal Peering Gateway
- EStorage Gateway
- FNAT Gateway
- GService Gateway
Correct Answer:
BFG
BFG
send
light_mode
delete
All Pages