Question #6
A customer recently set up Async Replication between Site A and Site B. The customer wants to conduct a planned failover and clicks Activate on Site B. The customer then runs the following command on Site A: ncli pd deactivate_and__destroy_vms name=<protection_domain_name>.
What does this do to the customer environment?
What does this do to the customer environment?
- AVMs get deleted from Site B and the protection domain is now Active.
- BVMs are powered off on Site A and must be manually powered on at Site B.
- CVMs get deleted from Site A and the protection domain is no longer active.
- DCustomer must then manually power off VMs at Site A and power them on at Site B.Most Voted
Correct Answer:
C
C

send
light_mode
delete
Question #7
An administrator needs to create and start five new VMs for a Data Analytics Project (OLAP). The VM Profile is as follows:
✑ vCPU:4
✑ vRAM: 64 GB
✑ vDisk: 1.5 TB
Each of the four nodes of the Nutanix cluster has the following:
✑ 24 vCPU. 20% overall usage
✑ 192 GB RAM, 60% overall usage
✑ 2 x l920 GB SSD
✑ 4 x 2 TB HDD
At cluster level, there is a single RF2 container that is 30% utilized and has an extent store capacity of 13.5 TB.
Which component requires administrator attention?
✑ vCPU:4
✑ vRAM: 64 GB
✑ vDisk: 1.5 TB
Each of the four nodes of the Nutanix cluster has the following:
✑ 24 vCPU. 20% overall usage
✑ 192 GB RAM, 60% overall usage
✑ 2 x l920 GB SSD
✑ 4 x 2 TB HDD
At cluster level, there is a single RF2 container that is 30% utilized and has an extent store capacity of 13.5 TB.
Which component requires administrator attention?
- APhysical RAM, because it is not enough to power on all of the new VMs.Most Voted
- BPhysical Cores, because they are not enough to power on all of the new VMs.
- CStorage, because the capacity is not enough to create VMs.
- DFlash Tier because it is not enough to accommodate the workloads.
Correct Answer:
A
A
send
light_mode
delete
Question #8
An administrator manages the following two Nutanix AOS 5.15 cluster environment:
✑ Corp-cluster-01
✑ Corp-cluster-02
The VM images must be available only on Corp-cluster-01, but cannot be checked out to cluster Corp-cluster-02. The images also cannot be checked out to any other clusters that are registered with Prism Central in the future.
Which two configuration settings must the administrator choose when creating the image placement policy that satisfies the stated requirements? (Choose two.)
✑ Corp-cluster-01
✑ Corp-cluster-02
The VM images must be available only on Corp-cluster-01, but cannot be checked out to cluster Corp-cluster-02. The images also cannot be checked out to any other clusters that are registered with Prism Central in the future.
Which two configuration settings must the administrator choose when creating the image placement policy that satisfies the stated requirements? (Choose two.)
- ACreate an image placement policy that identifies cluster Corp-cluster-01 as the target cluster
- BSet the policy enforcement to Soft.
- CSet the policy enforcement to Hard.
- DCreate an image placement policy that identifies cluster Corp-cluster-02 as the target cluster.
Correct Answer:
AC
AC
send
light_mode
delete
Question #9
An administrator is supporting a business critical environment and deploys metro availability to achieve a zero data loss configuration. The two clusters are connected by a 1GbE connection. A new workload is going to be deployed to this cluster. This workload requires a sustained 150MB/s of write throughput and
20MB/s of read throughput.
Which change must be made to deploy the workload successfully on this cluster?
20MB/s of read throughput.
Which change must be made to deploy the workload successfully on this cluster?
- AThe bandwidth must be increased to support this workload.
- BThe workload must be configured to read at greater than 12.5MB/s.
- CThe replication frequency must be less than 60 minutes.
- DZero data loss nearsync must be used to support this workload.
Correct Answer:
A
A
send
light_mode
delete
Question #10
Refer to the exhibit.

User 1 and User 2 belong to the AAPM group.
What are two descriptions of how Files perform quota management? (Choose two.)

User 1 and User 2 belong to the AAPM group.
What are two descriptions of how Files perform quota management? (Choose two.)
- AUser 2 can continue to add another 3GB file but will receive a daily notification email.
- BUser 1 can continue to add another 5GB file but will receive a daily notification email.Most Voted
- CUser 1 can add an 8GB file to the share without receiving notification.
- DUser 2 can add an 8GB file without receiving a notification email.Most Voted
Correct Answer:
BD
BD
send