Question #21
Click the Exhibit button.

Referring to the exhibit, which path would traffic passing through R1 take to get to R4?

Referring to the exhibit, which path would traffic passing through R1 take to get to R4?
- AR1 -> R3 -> R4
- BR1 -> R2 -> R3 -> R4
- CR1 -> R2 -> R4Most Voted
- DR1 -> R4
Correct Answer:
C
C
send
light_mode
delete
Question #22
Click the Exhibit button.

You want to use both links between R1 and R2. Because of the bandwidth difference between the two links, you must ensure that the links are used as much as possible.
Which action will accomplish this goal?

You want to use both links between R1 and R2. Because of the bandwidth difference between the two links, you must ensure that the links are used as much as possible.
Which action will accomplish this goal?
- AEnsure that the metric-out parameter on the Gigabit Ethernet interface is higher than the 10 Gigibit Ethernet interface.
- BDefine a policy to tag routes with the appropriate bandwidth community.Most Voted
- CEnable per-prefix load balancing.
- DDisable multipath.
Correct Answer:
C
C
send
light_mode
delete
Question #23
Which two statements are correct about the customer interface in an LDP-signaled pseudowire? (Choose two.)
- AWhen the encapsulation is vlan-ccc or extended-vlan-ccc, the configured VLAN tag is included in the control plane LDP advertisement.Most Voted
- BWhen the encapsulation is ethernet-ccc, tagged and untagged frames are both accepted in the data plane.Most Voted
- CWhen the encapsulation is ethernet-ccc, only frames without a VLAN tag are accepted in the data plane.
- DWhen the encapsulation is vlan-ccc or extended-vlan-ccc, the configured VLAN tag is not included in the control plane LDP advertisement.
Correct Answer:
AC
AC

In the context of LDP-signaled pseudowires, it's important to note that when the encapsulation type is vlan-ccc or extended-vlan-ccc, the specifically configured VLAN tag indeed plays a role in the LDP advertisement used in the control plane. This clarifies the protocol's approach to VLAN handling and tagging directly during the control signaling. On the other hand, for ethernet-ccc encapsulation, the handling of frames is restricted to those without a VLAN tag, thereby underscoring the operational distinction between these encapsulation types in handling tagged versus untagged frames. This understanding is crucial for effectively managing service delivery over pseudowires in a service provider environment.
send
light_mode
delete
Question #24
Click the Exhibit button.

Referring to the exhibit, CE-1 is providing NAT services for the hosts at Site 1 and you must provide Internet access for those hosts.
Which two statements are correct in this scenario? (Choose two.)

Referring to the exhibit, CE-1 is providing NAT services for the hosts at Site 1 and you must provide Internet access for those hosts.
Which two statements are correct in this scenario? (Choose two.)
- AYou must configure a static route in the main routing instance for the 203.0.113.1/32 prefix that uses the VPN-A.inet.0 table as the next hop.Most Voted
- BYou must configure a static route in the main routing instance for the 10.1.2.0/24 prefix that uses the VPN-A.inet.0 table as the next hop.
- CYou must configure a RIB group on PE-1 to leak a default route from the inet.0 table to the VPN-A.inet.0 table.Most Voted
- DYou must configure a RIB group on PE-1 to leak the 10.1.2.0/24 prefix from the VPN-A.inet.0 table to the inet.0 table.
Correct Answer:
BC
BC
send
light_mode
delete
Question #25
Click the Exhibit button.

You enabled a new router (R3) in your network but all destinations using IS-IS routes are not properly load balancing over this new router.
Referring to the exhibit, what is the problem?

You enabled a new router (R3) in your network but all destinations using IS-IS routes are not properly load balancing over this new router.
Referring to the exhibit, what is the problem?
- AR2 is missing internal routes for R1.
- BR1 is missing internal routes for R2.
- CR3 does not have wide-metrics enabled.
- DR1 does not have wide-metrics enabled.
Correct Answer:
C
C