IBM C9010-260 Exam Practice Questions (P. 4)
- Full Access (62 questions)
- Six months of Premium Access
- Access to one million comments
- Seamless ChatGPT Integration
- Ability to download PDF files
- Anki Flashcard files for revision
- No Captcha & No AdSense
- Advanced Exam Configuration
Question #16
A customer has a BladeCenter S (BCS) with a POWER6 blade. They want to upgrade to POWER8 with 8 cores, 12 internal drives with room for growth, and an external LTO tape drive.
Which of the following is the lowest recommendation to satisfy their requirement?
Which of the following is the lowest recommendation to satisfy their requirement?
- AS814
- BPOWER8 blade in the current BCS
- CS822
- DS824
Correct Answer:
A
Reference:
https://www.redbooks.ibm.com/redpapers/pdfs/redp5097.pdf
A
Reference:
https://www.redbooks.ibm.com/redpapers/pdfs/redp5097.pdf
send
light_mode
delete
Question #17
A customer wants to know how CAPI can benefit their operations.
What is a CAPI benefit?
What is a CAPI benefit?
- AAbility for a shared memory space between an application and an FPGA accelerator.
- BAbility for faster access to system memory from the POWER8 processor.
- CAbility for POWER8 LPARs to suspend/resume.
- DAbility to accelerate all database solutions.
Correct Answer:
A
Reference:
https://www-304.ibm.com/webapp/set2/sas/f/capi/capidetails.html
A
Reference:
https://www-304.ibm.com/webapp/set2/sas/f/capi/capidetails.html
send
light_mode
delete
Question #18
A customer will order a POWER8 hardware solution that was proposed.
Which of the following should be used to create and submit the appropriate hardware solution to IBM manufacturing?
Which of the following should be used to create and submit the appropriate hardware solution to IBM manufacturing?
send
light_mode
delete
Question #19
A customer wants to simplify virtualization management and specifically wants the ability to capture and deploy images of the virtual environment.
In addition to PowerVM, which software product will satisfy the requirement?
In addition to PowerVM, which software product will satisfy the requirement?
- APowerHA System Mirror
- BIBM Cloud PowerVC Manager
- CPowerVP
- DPowerKVM
Correct Answer:
B
Reference:
http://www-03.ibm.com/systems/power/software/virtualization-management/
B
Reference:
http://www-03.ibm.com/systems/power/software/virtualization-management/
send
light_mode
delete
Question #20
Which of the following is true concerning SAP HANA on POWER8?
- AWhen considering SAP in-memory HANA Database, IBM Power Systems should be sold as an SAP HANA appliance.
- BSAP HANA requirements can be mapped to any SAP certified POWER8 processor-based system, as long as it provides the resources.
- CThe IBM Power SAP HANA server decision has to be made to fit only the memory footprint requirements because of its in-memory design characteristics.
- DSAP HANA on Power Systems configurations should focus only on the database instance itself.
Correct Answer:
B
Reference:
http://www-03.ibm.com/support/techdocs/atsmastr.nsf/5cb5ed706d254a8186256c71006d2e0a/c32b40501f4f76c886257de0004fa1d4/$FILE/
SAP_HANA_on_Power-Planning_3.1.pdf
(page 10)
B
Reference:
http://www-03.ibm.com/support/techdocs/atsmastr.nsf/5cb5ed706d254a8186256c71006d2e0a/c32b40501f4f76c886257de0004fa1d4/$FILE/
SAP_HANA_on_Power-Planning_3.1.pdf
(page 10)
send
light_mode
delete
All Pages