Question #1
Refer to the exhibits.
Exhibit 1. Existing wiring plan:

Exhibit 2. Current proposal:

A customer has a building that needs a switch upgrade. The customer would like at least 20Gbps for the uplink bandwidth out of each closet. The building writing plan is shown in Exhibit 1. The customer will not consider any cable upgrades at this point. The current proposal is shown in Exhibit 2.
Which correction must architect make to the proposal to meet the customer requirements?
Exhibit 1. Existing wiring plan:

Exhibit 2. Current proposal:

A customer has a building that needs a switch upgrade. The customer would like at least 20Gbps for the uplink bandwidth out of each closet. The building writing plan is shown in Exhibit 1. The customer will not consider any cable upgrades at this point. The current proposal is shown in Exhibit 2.
Which correction must architect make to the proposal to meet the customer requirements?
- AChange the SR transceivers for each link between the writing closet switches and the network core to LRM transceivers.
- BAdd an aggregation layer, and connect writing closet switches to the aggregation layer on Smart Rate ports.Most Voted
- CAdd an aggregation layer, and connect writing closet switches to the aggregation layer with SFP+ SR transceivers.
- DAdd a mode conditioning cable for each link between the writing closet switches and the network core.
Correct Answer:
D
D
send
light_mode
delete
Question #2
What is one customer requirement that can drive the need for a relatively dense AP deployment, in which the coverage areas of at least three AP radios overlap?
- Asupport for beacon management
- BAP operation as hybrid AMs for IDS/WIPS
- Cthe deployment of dual 5GHz radio APs
- Dlocation tracking of wireless IoT devicesMost Voted
Correct Answer:
D
D
send
light_mode
delete
Question #3
Refer to the exhibit.

An architect has planned the wireless and wired access layers for a network upgrade. The entire solution must support 9,000 wireless devices and 2,250 wired endpoints.
The campus core must meet these requirements:
✑ no more than 4:1 oversubscription on the links to the data center
✑ switch-level redundancy
✑ near instant failover if one core switch fails
✑ link aggregations between access layer and core
✑ same switch software used across the entire campus
Which exhibit shows a campus core that meets the customer needs?
A.

B.

C.

D.


An architect has planned the wireless and wired access layers for a network upgrade. The entire solution must support 9,000 wireless devices and 2,250 wired endpoints.
The campus core must meet these requirements:
✑ no more than 4:1 oversubscription on the links to the data center
✑ switch-level redundancy
✑ near instant failover if one core switch fails
✑ link aggregations between access layer and core
✑ same switch software used across the entire campus
Which exhibit shows a campus core that meets the customer needs?
A.

B.

C.

D.

send
light_mode
delete
Question #4
A customer has an existing Aruba network, which currently supports up to 9,000 wireless client devices. The existing network includes these components:
✑ Four 7210 MCs
✑ Five 7030 MCs
✑ 200 AP-303HRs
✑ 300 AP-345s
The customer wants to convert to an ArubaOS 8.x architecture. The architect plans to deploy a virtual MM.
Which exhibit shows the correct BOM for the MM?
A.

B.

C.

D.

✑ Four 7210 MCs
✑ Five 7030 MCs
✑ 200 AP-303HRs
✑ 300 AP-345s
The customer wants to convert to an ArubaOS 8.x architecture. The architect plans to deploy a virtual MM.
Which exhibit shows the correct BOM for the MM?
A.

B.

C.

D.

send
light_mode
delete
Question #5
A customer has multiple medium and large branch sites, each of which requires between 8 and 16 APs and supports between 200 and 600 wireless clients. Every branch site has an internet connection, which it uses to reach the central data center. The customer would prefer the WAN links to be optimized in the solution.
Each side handles between 1 and 2 Gbps of traffic, most of which goes to the central data center. The data center has 7210 controllers for terminating the VPN connections.
Which branch office solution best meets the customer needs?
Each side handles between 1 and 2 Gbps of traffic, most of which goes to the central data center. The data center has 7210 controllers for terminating the VPN connections.
Which branch office solution best meets the customer needs?
- ACAPs and branch office controllers with an SD-WAN license
- BIAPs and no branch office controllers
- CCAPs and branch office controllers
- DRAPs and no branch office controllers
Correct Answer:
B