HP HPE0-S54 Exam Practice Questions (P. 5)
- Full Access (109 questions)
- One Year of Premium Access
- Access to one million comments
- Seamless ChatGPT Integration
- Ability to download PDF files
- Anki Flashcard files for revision
- No Captcha & No AdSense
- Advanced Exam Configuration
Question #21
A customer recently purchased HPE ProLiant Gen10 servers, but finds that their application does not appear to benefit from the newest Xeon processors.
Which features should be configured in the BIOS to overcome the issue?
Which features should be configured in the BIOS to overcome the issue?
- AServer Profile Templates
- BiLO CNSA Mode
- CWorkload Profiles
- DHigh Precision Event Timer
Correct Answer:
A
A
send
light_mode
delete
Question #22
A financial customer has a remote office that requires a significant amount of computing resources, but has no local IT staff. They need simple and affordable management and disaster recovery of their site.
Which solution should you recommend to meet this customer's needs?
Which solution should you recommend to meet this customer's needs?
- AHPE ConvergedSystem 300
- BHPE SimpliVity 380
- CHPE StoreOnce 5100
- DHPE Serviceguard for Linux
Correct Answer:
B
B
send
light_mode
delete
Question #23
A customer is installing multiple racks of DL380 Gen10 servers in a datacenter. They need to configure each one with identical BIOS settings.
Which tools are available to solve the situation? (Choose two.)
Which tools are available to solve the situation? (Choose two.)
- AHPE Active Health System
- BHPE Smart Update Manager
- CBIOS RESTful API
- DHPE ICsp
- EHPE Intelligent Provisioning
Correct Answer:
CE
Reference:
https://h20195.www2.hpe.com/V2/getpdf.aspx/4AA5-4487ENW.pdf
CE
Reference:
https://h20195.www2.hpe.com/V2/getpdf.aspx/4AA5-4487ENW.pdf
send
light_mode
delete
Question #24
Your customer has completed a successful Synergy Proof of Concept (PoC) consisting of a single frame with dual composers and dual Virtual Connect SE 40Gb
F8 modules.
The customer wants to:
✑ add a second frame before they move into production
✑ have unified management
have a separate logical enclosure for each frame

What are the basic steps to add the second frame? (Choose three.)
F8 modules.
The customer wants to:
✑ add a second frame before they move into production
✑ have unified management
have a separate logical enclosure for each frame

What are the basic steps to add the second frame? (Choose three.)
- AMove the standby composer to the second frame.
- BDisconnect the existing management ring, and then cable the FLM (frame link module) in the first frame to the FLMs in the second frame.
- CInstall a satellite module in the first frame.
- DMove the bottom VC module from the first frame to the second.
- EMove one of the uplinks from the FLM in the first frame to a FLM in the second.
Correct Answer:
ABE
ABE
send
light_mode
delete
Question #25
A customer wants to implement a large Microsoft Storage Spaces Direct environment.
Which protocol should the customer use?
Which protocol should the customer use?
send
light_mode
delete
All Pages
