HP HPE0-S51 Exam Practice Questions (P. 2)
- Full Access (118 questions)
- Six months of Premium Access
- Access to one million comments
- Seamless ChatGPT Integration
- Ability to download PDF files
- Anki Flashcard files for revision
- No Captcha & No AdSense
- Advanced Exam Configuration
Question #6
A customer requires an entry-level, all-flash system with predictable performance at the lowest possible price. They have performance-sensitive workloads that require speed and efficiency.
Which HPE storage system needs the customer's requirements?
Which HPE storage system needs the customer's requirements?
send
light_mode
delete
Question #7
You are installing a HPE MSA storage system and need to connect the power cooling module (PCM).
What should you do to ensure power redundancy?
What should you do to ensure power redundancy?
- AEnsure that a physical service processor is properly connected to each PCM
- BVerify that each cooling fan is cabled to a separate controller
- CConnect each PCM within a shelf to a different power distribution unit (PDU)
- DConnect redundant power cords from the PCM controller to independent power supplies
Correct Answer:
C
C
send
light_mode
delete
Question #8
A customer needs to purchase a redundant pair of SAN switches for their virtualization environment. The customer requires a total of eight 16 Gbps FC storage ports and eighteen 8 Gbps FC host attachments.
Which switch does meet the customer's needs at the lowest cost?
Which switch does meet the customer's needs at the lowest cost?
- AHPE 8/24 SAN Switch 16-port Switch with an 8-port Upgrade License
- BHPE StoreFabric SN6010C 12-port Switch with an On Demand Port Activation License
- CHPE 8/24 SAN Switch 16-port Switch
- DHPE StoreFabric SN6010C 48-port Switch
Correct Answer:
B
B
send
light_mode
delete
Question #9
A customer is enhancing their server and storage virtualization infrastructure. They need to maximize memory density per rack unit and provide an all-flash array to the environment.
Which HPE solutions should they install to fulfill these requirements? (Choose two.)
Which HPE solutions should they install to fulfill these requirements? (Choose two.)
- AMSA 2042
- BProLiant ML350 Gen10
- CNimble AF3000
- DProLiant DL380 Gen10
- EProLiant DL360 Gen10
Correct Answer:
AB
AB
send
light_mode
delete
Question #10
A customer needs the devices in their non-secure network to communicate in a secure manner. They are considering implementing Kerberos network authentication in their environment.
Which impact will this have when using iLO 5 with their HPE ProLiant Gen10 servers?
Which impact will this have when using iLO 5 with their HPE ProLiant Gen10 servers?
- AIt will enhance iLO security by leveraging the key stored in the silicon root of trust
- BIt will enable Zero Sign In to log in to iLO without entering a user name and password
- CIt will allow the server's iLO to detect compromised firmware code
- DIt will enable two-factor authentication when users log on to iLO
Correct Answer:
B
B
send
light_mode
delete
All Pages