Dell DES-6332 Exam Practice Questions (P. 1)
- Full Access (173 questions)
- Six months of Premium Access
- Access to one million comments
- Seamless ChatGPT Integration
- Ability to download PDF files
- Anki Flashcard files for revision
- No Captcha & No AdSense
- Advanced Exam Configuration
Question #1
DRAG DROP -
Match each management component with its characteristic.
Select and Place:

Match each management component with its characteristic.
Select and Place:

send
light_mode
delete
Question #2
An administrator attempts to add an S Series node to a Gen 2 VxRail cluster and the build fails. What is a possible reason for this failure?
- AIP address pool has no more free addresses
- BHybrid and Flash nodes cannot be mixed in the same cluster
- CQuanta and Dell nodes cannot be mixed in the same cluster
- DLoudmouth process needs to be restarted
Correct Answer:
B
Reference:
https://www.emc.com/collateral/TechnicalDocument/docu82227.pdf
B
Reference:
https://www.emc.com/collateral/TechnicalDocument/docu82227.pdf
send
light_mode
delete
Question #3
There is a request to add new disks to an existing VM residing on a VxRail vSAN that you manage. One disk is 250 GB. The VM is using the vSAN default storage policy.
How many vSAN objects will be created?
How many vSAN objects will be created?
send
light_mode
delete
Question #4
A VxRail administrator has been informed by Dell EMC that an Internet software upgrade is available for their VxRail cluster. The administrator logs into VxRail
Manager. VxRail Manager shows only the Local Upgrade option and not the Internet Upgrade option.
What is a possible reason?
Manager. VxRail Manager shows only the Local Upgrade option and not the Internet Upgrade option.
What is a possible reason?
- AThe VxRail Manager user has insufficient privileges
- BWorkstation accessing VxRail Manager does not have Internet connectivity
- CSecure Remote Services has not been enabled
- DVxRail Manager VM does not have Internet connectivity
Correct Answer:
D
D
send
light_mode
delete
Question #5
What are the vSAN storage policy settings applied to the VxRail Manager VM during initial setup?
- APrimary level of failures to tolerate = 1 Failure tolerance method = Erasure coding Object space reservation (%) = 100
- BPrimary level of failures to tolerate = 1 Object space reservation (%) = 100
- CPrimary level of failures to tolerate = 1 Failure tolerance method = Mirroring Object space reservation (%) = 50
- DPrimary level of failures to tolerate = 2 Failure tolerance method = Mirroring
Correct Answer:
C
Reference:
https://wuchikin.wordpress.com/2018/03/28/dell-emc-vxrail-vmware-virtual-san-stretched-cluster/
C
Reference:
https://wuchikin.wordpress.com/2018/03/28/dell-emc-vxrail-vmware-virtual-san-stretched-cluster/
send
light_mode
delete
All Pages