Question #6
Which two of the following apply during a project’s close out process? (Choose two.)
- ACommunicate discrepancies to responsible parties.
- BBegin testing of installed infrastructure.
- CEvaluate the surroundings of the project and report back to the communications distribution professional of these findings.
- DHire legal council for representation.
- ECreate schedule for completion of punch list.
send
light_mode
delete
Question #7
Telecommunications cabling (e.g., voice, data, video, security, audio, control) can be damaged during the construction phases of rough-in, drywall installation, and during the siding of the exterior. For these reasons, telecommunications cabling shall be acceptance tested. Acceptance testing includes visual examination and verification of all cabling and qualification of copper cabling for data cabling or certification of copper or optical fiber cabling for data cabling. Verification testing is generally performed in which two of the following steps? (Choose two.)
- APost the acceptance of the construction contract once the Project Manager has approved this phase
- BPrior to the installation of insulation and drywall
- CPrior to the installation of the cable tray system for spurs, points that would or could damage the cable infrastructure
- DDuring the trim-out stage of the cabling after painting
- EPost the implementation of the construction
send
light_mode
delete
Question #8
To properly size and provide accurate cost estimates for a communications distribution horizontal pathway that will include BAS system infrastructure, the designer should provide ________ for every BAS outlet or device based on total floor area.
- A9.30 m2 (100 ft2)
- B23.20 m2 (250 ft2)
- C91.40 m2 (300 ft2)
- D152.40 m2 (500 ft2)
send
light_mode
delete
Question #9
Which of the following is the process of limiting fire and smoke using fire-resistive barriers?
send
light_mode
delete
Question #10
An ICT distribution designer is providing labeling for a data center room number 2A, located on the second floor having 10 rows of cabinets. Which of the following identifiers/labels would the designer attach to the bonding and grounding conductor between the first cabinet in the 6th row and the data center ground bar?
send
light_mode
delete