SAP C_TPLM30_67 Exam Practice Questions (P. 1)
- Full Access (80 questions)
- Six months of Premium Access
- Access to one million comments
- Seamless ChatGPT Integration
- Ability to download PDF files
- Anki Flashcard files for revision
- No Captcha & No AdSense
- Advanced Exam Configuration
Question #1
While creating a measuring point for a piece of equipment, you cannot maintain the unit of measure of the measuring point.
What is the reason?
What is the reason?
- AThe measuring point references the unit of measure from the characteristic.
- BThe unit of measure can only be entered during the creation of a measurement document.
- CThe measuring point references the unit of measure from the capacity header of the work center assigned to the piece of equipment.
- DUnits of measure have NOT been configured for the measuring point category in Customizing.
Correct Answer:
C
C
send
light_mode
delete
Question #2
You want to outsource a maintenance order operation. For the operation you require the outside company to submit time sheets for approval.
What must you define?
What must you define?
- AThe parallelized confirmation process
- BA control key with the confirmation parameter set
- CA control key with the service parameter set
- DA default value profile for external procurement
Correct Answer:
D
D
send
light_mode
delete
Question #3
To which of the following can you assign a maintenance activity type? (Choose two.)
- AA technical object
- BA maintenance order operation
- CA maintenance order type
- DA task list
Correct Answer:
CD
CD
send
light_mode
delete
Question #4
Which of the following is an element of an information Structure?
send
light_mode
delete
Question #5
Your customer wants to make sure that a piece of equipment with the status ‘AVLB’ has passed testing prior to being installed in a functional location.
How can you achieve this? (Choose two.)
How can you achieve this? (Choose two.)
- ACustomize an appropriate status profile and assign it to the equipment category.
- BCustomize the equipment category as ‘test equipment’ and use the system status to control the installation.
- CCustomize a permit category and assign it to the equipment category.
- DCustomize an appropriate status profile and assign it to the equipment master.
Correct Answer:
BD
BD
send
light_mode
delete
All Pages