Question #1
Which of the following should be of GREATEST concern to an IS auditor reviewing an organization's business continuity plan (BCP)?
- AThe BCP has not been tested since it was first issued.Most Voted
- BThe BCP is not version-controlled.
- CThe BCP's contact information needs to be updated.
- DThe BCP has not been approved by senior management.
Correct Answer:
A
A

The lack of testing of the Business Continuity Plan (BCP) is indeed a significant concern for an IS auditor. Regular testing and revision are critical to ensure a BCP is effective and applicable in real-world scenarios. Without testing, there's no assurance that the strategies contained within the plan are feasible or that the responsible personnel are familiar with their duties in the event of an actual disaster. Testing not only identifies gaps or errors in a plan but also helps maintain the plan's relevance as organizational structures and technologies evolve. This practice aligns with ISACA's standards which emphasize the importance of testing and maintaining business continuity plans.
send
light_mode
delete
Question #2
Which of the following would be MOST useful when analyzing computer performance?
- ATuning of system software to optimize resource usage
- BOperations report of user dissatisfaction with response time
- CStatistical metrics measuring capacity utilizationMost Voted
- DReport of off-peak utilization and response time
Correct Answer:
B
B

To effectively analyze computer performance, integrating user feedback, as outlined in option B, is crucial. While statistical data on capacity utilization is beneficial for identifying technical inefficiencies, understanding user experiences provides direct insights into performance issues from an end-user perspective. This feedback is essential for pinpointing areas needing immediate improvement and aligning technical optimizations with user satisfaction, making it a comprehensive approach to performance analysis.
send
light_mode
delete
Question #3
Which of the following is the GREATEST risk if two users have concurrent access to the same database record?
- AEntity integrity
- BAvailability integrity
- CReferential integrity
- DData integrityMost Voted
Correct Answer:
D
D

Absolutely, the main issue when two folks mess with the same database record at the same time is all about keeping the data straight. This scenario can cause inaccurate or conflicting data entries, which ultimately messes with the reliability and consistency of the data stored. Always make sure systems capable of handling simultaneous data interactions are in place to prevent such headaches!
send
light_mode
delete
Question #4
Which of the following is the MOST effective way for an organization to help ensure agreed-upon action plans from an IS audit will be implemented?
- AEnsure ownership is assigned.
- BTest corrective actions upon completion.
- CEnsure sufficient audit resources are allocated.
- DCommunicate audit results organization-wide.
Correct Answer:
A
A

Assigning ownership for action plans is crucial because it directly links responsibility to specific individuals or teams. This approach effectively promotes accountability, ensuring that the actions required by the audit are not only acknowledged but also acted upon. Ownership provides clear lines of responsibility, making it easier to track progress and enforce completion, thus bolstering the likelihood of implementation.
send
light_mode
delete
Question #5
Which of the following issues associated with a data center's closed circuit television (CCTV) surveillance cameras should be of MOST concern to an IS auditor?
- ACCTV recordings are not regularly reviewed.
- BCCTV records are deleted after one year.
- CCCTV footage is not recorded 24 x 7.Most Voted
- DCCTV cameras are not installed in break rooms.
Correct Answer:
A
A

The primary concern for an IS auditor examining CCTV practices in a data center is that CCTV recordings aren't regularly reviewed. This is a significant aspect because consistent review ensures timely detection and response to any security incidents captured. Simply recording footage around the clock becomes ineffective if those recordings are not monitored for potential breaches or suspicious activities. Regular reviews are fundamental to maintaining effective security measures, making it the most critical concern compared to other aspects like recording duration or the camera locations, like break rooms.
send
light_mode
delete
Question #6
An IS auditor has been asked to audit the proposed acquisition of new computer hardware. The auditor's PRIMARY concern is that:
- Aa clear business case has been established.
- Bthe new hardware meets established security standards.Most Voted
- Ca full, visible audit trail will be included.
- Dthe implementation plan meets user requirements.
Correct Answer:
A
A

The primary focus for an IS auditor in the initial stages of auditing new hardware acquisition should be ensuring there's a solid business case. It's about confirming that the investment is justifiable in terms of meeting the overall business objectives. Security, user requirements, and audit capabilities are critical too, but they come into play after validating the fundamental business need for the hardware. This ensures that resources spent are aligned with strategic goals, making the business case a top priority at this phase.
send
light_mode
delete
Question #7
To confirm integrity for a hashed message, the receiver should use:
- Athe same hashing algorithm as the sender's to create a binary image of the file.
- Ba different hashing algorithm from the sender's to create a numerical representation of the file.
- Ca different hashing algorithm from the sender's to create a binary image of the file.
- Dthe same hashing algorithm as the sender's to create a numerical representation of the file.Most Voted
Correct Answer:
D
D

When checking the integrity of a hashed message, it's essential for the receiver to use the same hashing algorithm as the sender. This ensures that the generated hash value, which is essentially a numerical representation of the message, can be directly compared with the hash value sent along with the original message. If these hash values match, one can be confident that the message has not been altered in transit. This process validates the integrity of the message effectively, adhering to cryptographic principles. Using a different hashing algorithm could lead to discrepancies and fails to guarantee message integrity.
send
light_mode
delete
Question #8
An organization is implementing a new system that supports a month-end business process. Which of the following implementation strategies would be MOST efficient to decrease business downtime?
- ACutover
- BPhased
- CPilot
- DParallelMost Voted
Correct Answer:
C
C

A pilot implementation strategy is often chosen for minimizing disruptions in a critical business process because it allows the new system to be tested within a small, controlled segment of the organization before full-scale deployment. This approach helps in identifying and addressing potential issues in a lower-risk environment, thus reducing overall business downtime compared to options that involve immediate and organization-wide changes. This middle-ground solution offers a balance between efficiency and risk management which is often essential in environments where business continuity is crucial.
send
light_mode
delete
Question #9
Which of the following should be the FIRST step in managing the impact of a recently discovered zero-day attack?
- AEstimating potential damage
- BIdentifying vulnerable assets
- CEvaluating the likelihood of attack
- DAssessing the impact of vulnerabilities
Correct Answer:
B
B

Correctly identifying vulnerable assets is indeed the first step in managing the impact of a zero-day attack. This initial step allows organizations to focus specifically on those parts of their system that are at risk, enabling them to efficiently allocate resources and implement protective measures directly where needed. Recognizing which assets are susceptible informs the extent of security measures required and prioritizes subsequent actions such as estimating potential damage or evaluating the likelihood of an attack. This focused approach ensures timely and effective management of system vulnerabilities exposed by the zero-day attack.
send
light_mode
delete
Question #10
Which of the following is the BEST way to ensure that an application is performing according to its specifications?
- APilot testing
- BSystem testingMost Voted
- CIntegration testing
- DUnit testing
Correct Answer:
C
C

Integration testing remains the most effective method when ensuring that an application performs according to its specifications. This type of testing captures the cohesiveness and functionality of the application as a whole, focusing on how different parts of the application work together under various conditions. It is especially crucial in identifying system-level issues, including dependencies among different components, which is paramount to ensuring overall application performance aligns with its design specifications.